Vai al contenuto

Hybrid lift · Carezza · Trentino Alto Adige

Telemix Laner

Telemix Laner is a hybrid lift in Carezza, Trentino Alto Adige. It links the base station at 1,734 m with the top station at 1,858 m. The line measures 494 m and covers 124 m of vertical drop. Declared capacity is 2,300 people per hour. The lift was built by LEITNER.

Length
494 m
Vertical drop
124 m
Top station
1,858 m
Hourly capacity
2,300 p/h

Technical data

Base station1,734 mTop station1,858 m494 m124 m25%

Length 494 m · Vertical drop 124 m · Average gradient 25%

Hybrid lift Telemix Laner, Base station 1,734 m, Top station 1,858 m, Length 494 m, Vertical drop 124 m, Average gradient 25%.

Schematic, not a real elevation profile: we know the base altitude, the top altitude and the length of the line, not its shape. The drawn angle is indicative.
Lift type
Hybrid lift
Length
494 m
Vertical drop
124 m
Base station
1,734 m
Top station
1,858 m
Average gradient
25%
Hourly capacity
2,300 p/h
Seats per vehicle
4
Manufacturer
LEITNER

Lift data: OpenStreetMap (ODbL), updated on 23 August 2026. Report a correction

Map and route

Weather at the top station

Other lifts in Carezza

  • Plateau Drag lift · 2,423 m
  • Pala di Santa Chairlift · 2,318 m
  • Re Laurino II Gondola · 2,317 m
  • Gardonè - Passo Feudo Chairlift · 2,178 m
  • Tresca Chairlift · 2,170 m
  • La Residenza - Passo Feudo Chairlift · 2,164 m
  • Monte Agnello Chairlift · 2,163 m
  • Absam - Maierl Chairlift · 2,136 m

All lifts in Carezza →

Frequently asked questions

How long is Telemix Laner?

The line measures 494 m along the route mapped in OpenStreetMap, with 124 m of vertical drop.

What vertical drop does Telemix Laner cover?

Telemix Laner covers 124 m of vertical drop, from 1,734 m to 1,858 m. Altitudes come from OpenStreetMap and the Open-Meteo elevation model, so they can vary by a few metres.

How many people per hour does Telemix Laner carry?

Declared capacity is 2,300 people per hour, with 4 seats per vehicle. The figure is the maximum theoretical throughput of the lift, not the passengers actually carried.

Who built Telemix Laner and when?

The lift was built by LEITNER. The data comes from the OpenStreetMap tags of the lift: if you have the official technical sheet, let us know.

When is Telemix Laner open?

Opening times follow the lift calendar of Carezza: usually December to April, with a summer season from June to September where it is offered. Dates change every year and are published by the lift operator.

Where is Telemix Laner and how do you get there?

The base station is in Carezza, Trentino Alto Adige, at 1,734 m. The map on this page shows the starting point and the route up to 1,858 m. Car parks and bus stops differ from resort to resort: current directions are on the operator site.