Trentino Alto Adige · Bolzano
Cable cars and ski lifts in Dolomiti Superski
Dolomiti Superski has 468 active lifts mapped on OpenStreetMap: 18 cable cars, 100 gondolas, 2 hybrid lifts, 185 chairlifts, 106 drag lifts, 5 rope tows and 52 magic carpets.
Active lifts
468
Top altitude
3,215 m
Serauta - Punta Rocca
Longest lift
4,264 m
Ried
Total capacity
516,509
people/hour
Dolomiti Superski has 468 active lifts mapped on OpenStreetMap: 18 cable cars, 100 gondolas, 2 hybrid lifts, 185 chairlifts, 106 drag lifts, 5 rope tows and 52 magic carpets. The highest is Serauta - Punta Rocca, reaching 3,215 m; the longest is Ried, with a 4,264 m line.
The combined capacity of the lifts with declared data is 516,509 people per hour. The total vertical drop served by the main lifts exceeds 97,108 m.
All lifts
| Seats | Ride time | ||||||
|---|---|---|---|---|---|---|---|
| Tiers am Rosengarten - Frommeralmbike transport | Cable car | 3,595 m | 628 m | 1,122 / 1,750 m | - | 60 | 7 min |
| Funifor Arabba - Portavescovobike transport | Cable car | 2,543 m | 851 m | 1,604 / 2,455 m | 800 people/hour | 80 | 4.17 min |
| Cortina – Mandres – Faloria | Cable car | 2,519 m | 848 m | 1,229 / 2,077 m | 600 people/hour | - | 5.5 min |
| FUF Alba - Col dei Rossibike transport | Cable car | 2,102 m | 867 m | 1,490 / 2,357 m | - | 100 | 3.5 min |
| Furnes - Secedabike transport | Cable car | 1,910 m | 702 m | 1,731 / 2,433 m | 800 people/hour | 62 | 0 min |
| Piz Sella | Cable car | 1,612 m | 418 m | 1,783 / 2,201 m | 1,200 people/hour | 100 | 3 min |
| Col Drusciè - Ra Valles | Cable car | 1,502 m | 698 m | 1,755 / 2,453 m | 1,066 people/hour | - | 2.5 min |
| Coston d’Antermoja - Serauta | Cable car | 1,440 m | 558 m | 2,313 / 2,871 m | 960 people/hour | 70 | 3.5 min |
| Ra Valles - Cima Tofana | Cable car | 1,439 m | 686 m | 2,453 / 3,139 m | 650 people/hour | 40 | 2.5 min |
| Vigo - Catinaccio | Cable car | 1,416 m | 558 m | 1,434 / 1,992 m | 1,300 people/hour | 100 | 2.66 min |
| Serauta - Punta Rocca | Cable car | 1,370 m | 344 m | 2,871 / 3,215 m | 1,008 people/hour | 70 | 3.2 min |
| Sass Pordoi | Cable car | 1,303 m | 677 m | 2,242 / 2,919 m | 465 people/hour | 70 | 2.66 min |
| Malga Ciapela-Coston d’Antermoja | Cable car | 1,276 m | 853 m | 1,460 / 2,313 m | 960 people/hour | 70 | 3.7 min |
| Col Margheritabike transport | Cable car | 1,256 m | 591 m | 1,874 / 2,465 m | 1,330 people/hour | 96 | 3 min |
| Pecol - Col dei Rossibike transport | Cable car | 1,235 m | 424 m | 1,933 / 2,357 m | 1,100 people/hour | 80 | 2.33 min |
| Funivia ENEL Lago Cavia | Cable car | 1,212 m | 530 m | 1,561 / 2,091 m | - | - | - |
| Funivia Rosettabike transport | Cable car | 1,158 m | 597 m | 1,988 / 2,585 m | - | - | - |
| Falzarego - Lagazuoiopen in summer | Cable car | 934 m | 611 m | 2,106 / 2,717 m | 846 people/hour | 50 | 2.5 min |
| Riedheated seatsbike transport | Gondola | 4,264 m | 790 m | 933 / 1,723 m | 3,200 people/hour | 10 | 13 min |
| Cabinovia Alpe di Siusibike transport | Gondola | 4,081 m | 857 m | 999 / 1,856 m | 2,400 people/hour | 16 | 13 min |
| Kronplatz 2000bike transport | Gondola | 3,819 m | 1,307 m | 949 / 2,256 m | 2,000 people/hour | 8 | 12 min |
| Nova Levante Laurino 1bike transport | Gondola | 3,551 m | 553 m | 1,186 / 1,739 m | - | 10 | - |
| Versciaco-Monte Elmo | Gondola | 2,931 m | 906 m | 1,136 / 2,042 m | 1,800 people/hour | 6 | - |
| Olang Iheated seatsbike transport | Gondola | 2,920 m | 890 m | 1,180 / 2,070 m | 3,900 people/hour | 10 | 8.5 min |
| Plan de Corones Ibike transport | Gondola | 2,712 m | 898 m | 953 / 1,851 m | 2,250 people/hour | 8 | 8.8 min |
| Boèopen in summer | Gondola | 2,548 m | 656 m | 1,536 / 2,192 m | 3,000 people/hour | 8 | 8 min |
| Ortisei - Furnesbike transport | Gondola | 2,543 m | 475 m | 1,256 / 1,731 m | 1,600 people/hour | 8 | 9.3 min |
| Cortina Skyline (Cianzopè - Bai de Dones)bubble | Gondola | 2,455 m | 152 m | 1,728 / 1,880 m | 1,800 people/hour | 10 | 7 min |
| Pradel - Rodellaopen in summerbike transport | Gondola | 2,454 m | 505 m | 1,729 / 2,234 m | 2,000 people/hour | 8 | 9 min |
| Col Rodellabike transport | Gondola | 2,402 m | 981 m | 1,411 / 2,392 m | - | 30 | - |
| Stalimen - Gardonèbike transport | Gondola | 2,331 m | 608 m | 1,046 / 1,654 m | 2,400 people/hour | 6 | - |
| Doss dei Laresi - Cermis | Gondola | 2,329 m | 728 m | 1,270 / 1,998 m | 2,400 people/hour | 8 | 9 min |
| Col Raiser | Gondola | 2,289 m | 538 m | 1,561 / 2,099 m | 2,030 people/hour | 8 | 0 min |
| Fodom (Vauz - Pordoi)detachableopen in summerbike transport | Gondola | 2,245 m | 380 m | 1,857 / 2,237 m | 2,800 people/hour | 10 | 8.33 min |
| Tognolabike transport | Gondola | 2,214 m | 698 m | 1,414 / 2,112 m | - | - | - |
| Funivia del Corno del Renonbubble | Gondola | 2,190 m | 532 m | 1,534 / 2,066 m | 1,800 people/hour | 8 | 7 min |
| Alpen Connectingheated seats | Gondola | 2,176 m | 530 m | 1,624 / 2,154 m | 3,100 people/hour | 10 | 6.7 min |
| Fondovalle - Doss dei Laresi | Gondola | 2,143 m | 413 m | 857 / 1,270 m | 2,000 people/hour | 8 | 7 min |
| Cortina Skyline (Son dei Prade - Cianzopè)bubble | Gondola | 2,129 m | 74 m | 1,654 / 1,728 m | 1,800 people/hour | 10 | 7 min |
| Dantercepies Iheated seatsbike transport | Gondola | 2,122 m | 497 m | 1,643 / 2,140 m | 3,000 people/hour | 10 | 6.53 min |
| La Crusc 1heated seats | Gondola | 2,100 m | 499 m | 1,332 / 1,831 m | 2,400 people/hour | 10 | 5.9 min |
| Helmjet Sextenbike transport | Gondola | 2,099 m | 719 m | 1,315 / 2,034 m | 2,200 people/hour | 10 | - |
| Schilling | Gondola | 2,011 m | 438 m | 1,372 / 1,810 m | - | 8 | - |
| Colbricon Expressbike transport | Gondola | 1,967 m | 345 m | 1,472 / 1,817 m | 2,400 people/hour | 10 | - |
| Col dei Baldi | Gondola | 1,956 m | 463 m | 1,446 / 1,909 m | - | 8 | - |
| Tre Cimebike transport | Gondola | 1,954 m | 642 m | 1,441 / 2,083 m | 1,800 people/hour | 8 | 5.67 min |
| Pian Frataces - Gherdeciabike transport | Gondola | 1,928 m | 462 m | 1,728 / 2,190 m | 2,000 people/hour | 8 | 7.17 min |
| Gaisjoch | Gondola | 1,926 m | 179 m | 1,631 / 1,810 m | - | 8 | - |
| Croda Rossabike transport | Gondola | 1,913 m | 556 m | 1,358 / 1,914 m | - | - | - |
| Pozza - Buffaure | Gondola | 1,888 m | 719 m | 1,349 / 2,068 m | 1,500 people/hour | 6 | 7.5 min |
| Falcade - Le Busebubblebike transport | Gondola | 1,788 m | 680 m | 1,220 / 1,900 m | 2,400 people/hour | 8 | 6 min |
| Alba – Ciampac | Gondola | 1,787 m | 657 m | 1,490 / 2,147 m | 2,000 people/hour | 10 | 5.83 min |
| Piz la Ilabike transport | Gondola | 1,761 m | 625 m | 1,435 / 2,060 m | 2,200 people/hour | 15 | 5.7 min |
| Saslong | Gondola | 1,759 m | 475 m | 1,420 / 1,895 m | 2,200 people/hour | 12 | 6.33 min |
| Ciampinoiopen in summerbike transport | Gondola | 1,755 m | 672 m | 1,566 / 2,238 m | 2,400 people/hour | 12 | 6.33 min |
| Miara | Gondola | 1,737 m | 256 m | 1,222 / 1,478 m | 3,000 people/hour | 8 | 5.2 min |
| Ortisei - Alpe di Siusibubblebike transport | Gondola | 1,722 m | 793 m | 1,214 / 2,007 m | 2,200 people/hour | 15 | 0 min |
| Jochtalbahn | Gondola | 1,698 m | 619 m | 1,376 / 1,995 m | - | 8 | - |
| Piz Soregabike transport | Gondola | 1,692 m | 463 m | 1,534 / 1,997 m | 3,000 people/hour | 8 | 6.3 min |
| Gipfelbahnbike transport | Gondola | 1,655 m | 527 m | 1,723 / 2,250 m | 4,000 people/hour | 10 | 5.2 min |
| Monte Fana | Gondola | 1,654 m | 538 m | 1,935 / 2,473 m | - | 10 | 5 min |
| Marchnerheated seats | Gondola | 1,649 m | 451 m | 1,559 / 2,010 m | 3,000 people/hour | 10 | 5.2 min |
| Nesselbahn | Gondola | 1,626 m | 481 m | 1,623 / 2,104 m | - | 8 | - |
| Piani di Pezzèbike transport | Gondola | 1,599 m | 498 m | 978 / 1,476 m | - | - | - |
| Marinzen | Gondola | 1,590 m | 415 m | 1,057 / 1,472 m | 1,200 people/hour | 10 | 4.55 min |
| Bergbahn | Gondola | 1,580 m | 228 m | 1,395 / 1,623 m | - | 8 | - |
| Piculin | Gondola | 1,547 m | 532 m | 1,088 / 1,620 m | 2,400 people/hour | 8 | 5 min |
| Ruis | Gondola | 1,511 m | 523 m | 1,741 / 2,264 m | 3,000 people/hour | 8 | 5.8 min |
| Cabinovia Colverdebike transport | Gondola | 1,510 m | 460 m | 1,506 / 1,966 m | - | - | - |
| Frarabike transport | Gondola | 1,471 m | 398 m | 1,834 / 2,232 m | 2,200 people/hour | 8 | 5.5 min |
| Valbona - Le Cune | Gondola | 1,467 m | 368 m | 1,804 / 2,172 m | 8 people/hour | - | - |
| Castelir - Fassanebike transport | Gondola | 1,457 m | 225 m | 1,550 / 1,775 m | - | 10 | - |
| Plosebahn I | Gondola | 1,410 m | 545 m | 1,060 / 1,605 m | 2,400 people/hour | 10 | 6 min |
| Cabinovia Forcella del Sassolungoopen in summer | Gondola | 1,404 m | 554 m | 2,183 / 2,737 m | - | 2 | 15 min |
| Colfoscoopen in summer | Gondola | 1,373 m | 249 m | 1,609 / 1,858 m | 2,000 people/hour | 8 | 5 min |
| Col Toron | Gondola | 1,365 m | 315 m | 1,475 / 1,790 m | 2,600 people/hour | 9 | 5 min |
| Portados | Gondola | 1,355 m | 488 m | 1,611 / 2,099 m | - | 8 | 4.33 min |
| Franzinbubbleheated seats | Gondola | 1,336 m | 183 m | 1,588 / 1,771 m | 2,400 people/hour | 10 | - |
| Borestdetachableopen in summerbike transport | Gondola | 1,311 m | 57 m | 1,542 / 1,599 m | 3,300 people/hour | 8 | 4.67 min |
| Lacedel-Socrepes | Gondola | 1,303 m | 226 m | 1,339 / 1,565 m | 3,000 people/hour | 10 | 3.7 min |
| Cortina - Colfiere | Gondola | 1,298 m | 245 m | 1,210 / 1,455 m | 1,800 people/hour | 10 | 6.5 min |
| Ochsenweidebike transport | Gondola | 1,290 m | 305 m | 1,531 / 1,836 m | 2,000 people/hour | - | - |
| Canazei - Pecolbike transport | Gondola | 1,274 m | 462 m | 1,453 / 1,915 m | 2,400 people/hour | 12 | 5 min |
| Lezuo | Gondola | 1,263 m | 313 m | 2,079 / 2,392 m | 3,400 people/hour | 10 | 3.6 min |
| Signaue | Gondola | 1,240 m | 297 m | 1,439 / 1,736 m | - | - | - |
| Valcigolera | Gondola | 1,229 m | 454 m | 1,890 / 2,344 m | - | - | - |
| Hubertus | Gondola | 1,225 m | 129 m | 1,633 / 1,762 m | 2,000 people/hour | 8 | - |
| Orto del Toro | Gondola | 1,219 m | 361 m | 1,722 / 2,083 m | 1,500 people/hour | 8 | 5 min |
| Toè | Gondola | 1,197 m | 330 m | 1,931 / 2,261 m | - | 8 | 4.5 min |
| Plansbike transport | Gondola | 1,194 m | 168 m | 1,666 / 1,834 m | 2,200 people/hour | 8 | 4.33 min |
| Ronchi - Valbona | Gondola | 1,159 m | 436 m | 1,368 / 1,804 m | 2,400 people/hour | 8 | 6 min |
| Pian del Crepbike transport | Gondola | 1,134 m | 389 m | 1,380 / 1,769 m | 3,000 people/hour | 12 | - |
| Kronplatz II | Gondola | 1,115 m | 405 m | 1,851 / 2,256 m | 2,250 people/hour | 8 | 3.5 min |
| Plosebahn II | Gondola | 1,096 m | 427 m | 1,605 / 2,032 m | 2,400 people/hour | 10 | 3 min |
| Olang IIheated seatsbike transport | Gondola | 1,076 m | 192 m | 2,070 / 2,262 m | 3,900 people/hour | 10 | 3 min |
| Fassane - Moreabike transport | Gondola | 1,076 m | 184 m | 1,775 / 1,959 m | 2,600 people/hour | 10 | - |
| Belvedere | Gondola | 1,061 m | 262 m | 2,010 / 2,272 m | 3,300 people/hour | 15 | 3.8 min |
| Latemarbike transport | Gondola | 1,056 m | 250 m | 1,767 / 2,017 m | 2,700 people/hour | 10 | 4 min |
| Korer | Gondola | 1,025 m | 164 m | 935 / 1,099 m | 2,000 people/hour | 8 | 3.8 min |
| Ski Express I | Gondola | 1,021 m | 344 m | 1,715 / 2,059 m | - | 10 | - |
| Piz Seteur 1heated seatsdetachablebike transport | Gondola | 994 m | 179 m | 1,794 / 1,973 m | 3,600 people/hour | 10 | 3 min |
| La Crusc 2heated seatsbike transport | Gondola | 960 m | 153 m | 1,841 / 1,994 m | 1,500 people/hour | 10 | 3.2 min |
| Col Altobike transport | Gondola | 952 m | 382 m | 1,546 / 1,928 m | 2,800 people/hour | 8 | 3.67 min |
| Re Laurino IIheated seats | Gondola | 921 m | 327 m | 1,990 / 2,317 m | - | 10 | - |
| Re Laurino Ibike transport | Gondola | 874 m | 243 m | 1,747 / 1,990 m | - | 10 | - |
| Pré da Peres | Gondola | 855 m | 230 m | 1,755 / 1,985 m | 2,200 people/hour | 8 | 2.7 min |
| Colfiere - Col Drusciè | Gondola | 814 m | 300 m | 1,455 / 1,755 m | 1,800 people/hour | 10 | 6.5 min |
| Ski Express II | Gondola | 783 m | 150 m | 2,059 / 2,209 m | - | 10 | - |
| Piz de Plaies | Gondola | 727 m | 294 m | 1,324 / 1,618 m | 2,700 people/hour | 8 | 5.2 min |
| Pedagà | Gondola | 664 m | 138 m | 1,186 / 1,324 m | 3,200 people/hour | 8 | 2 min |
| Rara | Gondola | 573 m | 136 m | 1,692 / 1,828 m | 2,700 people/hour | 10 | 2.2 min |
| Cavalese - Fondovalle | Gondola | 572 m | 125 m | 857 / 982 m | 2,000 people/hour | - | - |
| Col Pradatopen in summerbike transport | Gondola | 547 m | 287 m | 1,729 / 2,016 m | 1,800 people/hour | 8 | 2.17 min |
| Dantercepies IIheated seatsbike transport | Gondola | 530 m | 142 m | 2,140 / 2,282 m | 3,000 people/hour | 10 | 1.63 min |
| Orto del Toro | Gondola | 524 m | 40 m | 1,682 / 1,722 m | 1,500 people/hour | 8 | 5 min |
| Piz Seteur 2heated seatsdetachable | Gondola | 520 m | 117 m | 1,973 / 2,090 m | 3,600 people/hour | 10 | 1.5 min |
| Skitrans Bronta | Gondola | 415 m | 39 m | 1,184 / 1,223 m | 2,400 people/hour | 12 | 1.8 min |
| Cianross | Gondola | 305 m | 94 m | 1,202 / 1,296 m | 1,200 people/hour | 8 | 1.3 min |
| Bullacciabubblebike transport | Hybrid lift | 939 m | 293 m | 1,802 / 2,095 m | 2,200 people/hour | 86 | 3.5 min |
| Telemix Laner | Hybrid lift | 494 m | 124 m | 1,734 / 1,858 m | 2,300 people/hour | 4 | - |
| Padonbubbledetachablebike transport | Chairlift | 2,380 m | 724 m | 1,692 / 2,416 m | 2,000 people/hour | 4 | 8.83 min |
| Tschein | Chairlift | 2,165 m | 397 m | 1,579 / 1,976 m | 2,000 people/hour | 6 | 6 min |
| Campo - Lastébubble | Chairlift | 2,131 m | 465 m | 1,870 / 2,335 m | 2,400 people/hour | 4 | - |
| Lago Cavia - Col Margheritabubble | Chairlift | 1,992 m | 413 m | 2,101 / 2,514 m | 1,800 people/hour | 4 | 8 min |
| Florianbubbledetachablebike transport | Chairlift | 1,980 m | 410 m | 1,671 / 2,081 m | 2,400 people/hour | 4 | 7.2 min |
| Paolinabubbledetachable | Chairlift | 1,931 m | 484 m | 1,633 / 2,117 m | 2,400 people/hour | 4 | 7.333 min |
| Masareidetachable | Chairlift | 1,882 m | 371 m | 1,762 / 2,133 m | 2,200 people/hour | 6 | 7 min |
| Orsa Maggiorebubbledetachable | Chairlift | 1,867 m | 324 m | 2,096 / 2,420 m | 1,800 people/hour | 4 | 7 min |
| Fermedadetachablebike transport | Chairlift | 1,830 m | 462 m | 2,035 / 2,497 m | 2,000 people/hour | 4 | 6.8 min |
| Rio Gere - Son Forcabubble | Chairlift | 1,802 m | 523 m | 1,699 / 2,222 m | - | 4 | - |
| Obereggen - Oberholz | Chairlift | 1,784 m | 520 m | 1,555 / 2,075 m | 1,800 people/hour | 4 | - |
| Punta d'Orobubbleheated seatsdetachable | Chairlift | 1,777 m | 315 m | 1,892 / 2,207 m | 2,000 people/hour | 4 | 6.5 min |
| Bus Tofanabubble | Chairlift | 1,766 m | 518 m | 2,201 / 2,719 m | 2,000 people/hour | 4 | 7.5 min |
| Prà Fiori | Chairlift | 1,665 m | 474 m | 1,756 / 2,230 m | - | 4 | - |
| Gardonè - Passo Feudobike transport | Chairlift | 1,650 m | 529 m | 1,649 / 2,178 m | 2,000 people/hour | 4 | - |
| Vizza | Chairlift | 1,622 m | 312 m | 1,769 / 2,081 m | 1,200 people/hour | 2 | 12 min |
| Costabellabubblebike transport | Chairlift | 1,582 m | 354 m | 1,918 / 2,272 m | 2,400 people/hour | 4 | 6 min |
| Seggiovia Pescul - Fertazzabubblebike transport | Chairlift | 1,579 m | 443 m | 1,405 / 1,848 m | 2,400 people/hour | 4 | - |
| Floralpinabubbledetachable | Chairlift | 1,556 m | 263 m | 1,677 / 1,940 m | 1,600 people/hour | 4 | 5.7 min |
| Col de la Grava | Chairlift | 1,556 m | 269 m | 1,586 / 1,855 m | - | 4 | - |
| Gigante | Chairlift | 1,542 m | 342 m | 1,916 / 2,258 m | 2,400 people/hour | 4 | 6 min |
| Monte Seurabubbledetachableopen in summerbike transport | Chairlift | 1,531 m | 394 m | 1,627 / 2,021 m | 2,200 people/hour | 4 | - |
| Vajolet IIbubble | Chairlift | 1,485 m | 221 m | 1,581 / 1,802 m | - | 4 | 5.33 min |
| Punta Cesbubble | Chairlift | 1,465 m | 593 m | 1,604 / 2,197 m | - | 4 | - |
| Schönbodenbahnbubble | Chairlift | 1,457 m | 299 m | 2,007 / 2,306 m | - | 4 | - |
| Arndtbubble | Chairlift | 1,451 m | 396 m | 1,683 / 2,079 m | 2,000 people/hour | 6 | 5.5 min |
| Laurindetachable | Chairlift | 1,445 m | 263 m | 1,754 / 2,017 m | 2,000 people/hour | 4 | 5.2 min |
| Hasenköpflbubbleheated seats | Chairlift | 1,424 m | 306 m | 1,909 / 2,215 m | 3,000 people/hour | 8 | - |
| Campo - Le Cunebubble | Chairlift | 1,417 m | 338 m | 1,871 / 2,209 m | 2,400 people/hour | 4 | - |
| Tresca | Chairlift | 1,397 m | 311 m | 1,859 / 2,170 m | 1,800 people/hour | 4 | - |
| Fedare - Nuvolaobike transport | Chairlift | 1,396 m | 415 m | 2,014 / 2,429 m | 700 people/hour | 2 | 14 min |
| Carpazza | Chairlift | 1,386 m | 406 m | 1,921 / 2,327 m | 2,400 people/hour | 6 | 5.33 min |
| Absam - Maierlbubble | Chairlift | 1,376 m | 406 m | 1,730 / 2,136 m | 2,800 people/hour | 6 | - |
| Saline-Lareseibubble | Chairlift | 1,371 m | 357 m | 1,908 / 2,265 m | 2,400 people/hour | 4 | 5.2 min |
| Panoramabubbledetachablebike transport | Chairlift | 1,352 m | 194 m | 1,810 / 2,004 m | 2,600 people/hour | 6 | 3.8 min |
| Sponatadetachable | Chairlift | 1,349 m | 358 m | 1,353 / 1,711 m | 1,600 people/hour | 4 | 5.2 min |
| Porzen | Chairlift | 1,345 m | 303 m | 1,667 / 1,970 m | 2,400 people/hour | 6 | 5 min |
| Monte Baranci | Chairlift | 1,332 m | 313 m | 1,177 / 1,490 m | - | 4 | 4 min |
| Piavac | Chairlift | 1,311 m | 417 m | 1,780 / 2,197 m | - | 4 | - |
| Col de Vardabike transport | Chairlift | 1,298 m | 347 m | 1,750 / 2,097 m | - | 2 | 10 min |
| 5 Torribubblebike transport | Chairlift | 1,297 m | 351 m | 1,880 / 2,231 m | 2,200 people/hour | - | 4.8 min |
| Mittelstationbubble | Chairlift | 1,279 m | 353 m | 1,676 / 2,029 m | - | 6 | - |
| Kristianiabubbleheated seatsdetachable | Chairlift | 1,272 m | 301 m | 2,056 / 2,357 m | - | 6 | 4.67 min |
| Città dei Sassibubbledetachable | Chairlift | 1,258 m | 234 m | 2,029 / 2,263 m | 2,200 people/hour | 4 | 4.67 min |
| Paradisobubbledetachable | Chairlift | 1,252 m | 229 m | 1,909 / 2,138 m | 2,190 people/hour | 6 | 4.7 min |
| Gardenacciadetachablebike transport | Chairlift | 1,239 m | 379 m | 1,433 / 1,812 m | 1,800 people/hour | 4 | 4.7 min |
| Olympia | Chairlift | 1,231 m | 206 m | 1,454 / 1,660 m | 2,400 people/hour | 4 | 4.5 min |
| Arlarabubbledetachable | Chairlift | 1,222 m | 342 m | 1,665 / 2,007 m | 2,000 people/hour | 4 | 4.67 min |
| Braia Fraidadetachablebike transport | Chairlift | 1,210 m | 90 m | 1,930 / 2,020 m | 2,800 people/hour | 6 | 4.2 min |
| Roncato - Festis (Tofana Express) | Chairlift | 1,209 m | 284 m | 1,495 / 1,779 m | 2,800 people/hour | 6 | 4.5 min |
| Plateaububbleheated seats | Chairlift | 1,183 m | 222 m | 2,040 / 2,262 m | 3,600 people/hour | 8 | 4.3 min |
| Pioda | Chairlift | 1,177 m | 361 m | 1,517 / 1,878 m | - | 2 | - |
| Le Buse - Laresei | Chairlift | 1,172 m | 335 m | 1,895 / 2,230 m | 2,400 people/hour | 4 | 4.5 min |
| Doladizza | Chairlift | 1,169 m | 329 m | 1,856 / 2,185 m | 900 people/hour | 2 | - |
| San Marcobike transport | Chairlift | 1,161 m | 358 m | 1,224 / 1,582 m | - | - | - |
| Costabella | Chairlift | 1,155 m | 326 m | 1,875 / 2,201 m | - | 4 | - |
| Conca | Chairlift | 1,153 m | 204 m | 1,979 / 2,183 m | - | 2 | - |
| Pala di Santa | Chairlift | 1,140 m | 380 m | 1,938 / 2,318 m | 2,000 people/hour | 4 | - |
| Pralongiàbike transport | Chairlift | 1,130 m | 292 m | 1,711 / 2,003 m | 1,794 people/hour | 6 | 4.33 min |
| Sasso Levantedetachable | Chairlift | 1,128 m | 213 m | 2,174 / 2,387 m | 2,598 people/hour | 6 | 3.97 min |
| Pralongià IIdetachable | Chairlift | 1,100 m | 213 m | 1,887 / 2,100 m | 2,000 people/hour | 4 | 4 min |
| Pra di Toribubbledetachable | Chairlift | 1,081 m | 291 m | 1,752 / 2,043 m | 2,000 people/hour | 4 | - |
| Hinterberg | Chairlift | 1,079 m | 266 m | 1,824 / 2,090 m | - | 6 | - |
| Pian de Ra Bigontina | Chairlift | 1,078 m | 302 m | 1,752 / 2,054 m | - | 4 | - |
| Cigolera | Chairlift | 1,068 m | 297 m | 1,915 / 2,212 m | - | 6 | - |
| Rossalmbubble | Chairlift | 1,062 m | 302 m | 2,196 / 2,498 m | - | 6 | - |
| Monte Agnello | Chairlift | 1,057 m | 396 m | 1,767 / 2,163 m | 2,100 people/hour | 4 | - |
| Piè Tofana - Duca d'Aosta | Chairlift | 1,050 m | 403 m | 1,689 / 2,092 m | 2,400 people/hour | 4 | 4.2 min |
| Vajolet Ibubble | Chairlift | 1,050 m | 254 m | 1,327 / 1,581 m | - | 4 | 4 min |
| Forcellesdetachable | Chairlift | 1,032 m | 302 m | 1,825 / 2,127 m | 2,600 people/hour | 6 | 3.5 min |
| Steger Dellai | Chairlift | 1,031 m | 168 m | 1,775 / 1,943 m | 600 people/hour | 2 | 9.5 min |
| Vallonopen in summer | Chairlift | 1,029 m | 320 m | 2,201 / 2,521 m | 1,200 people/hour | 2 | 8 min |
| Col Fioret | Chairlift | 1,017 m | 283 m | 1,792 / 2,075 m | - | 4 | - |
| Norei - 5 Ditabubbledetachable | Chairlift | 1,014 m | 267 m | 2,121 / 2,388 m | 1,800 people/hour | 4 | 3.83 min |
| Spitzbühlbubbleheated seatsbike transport | Chairlift | 1,010 m | 190 m | 1,720 / 1,910 m | 2,400 people/hour | 6 | 3 min |
| Gran Paradisobubbleheated seatsbike transport | Chairlift | 1,005 m | 240 m | 2,025 / 2,265 m | 4,800 people/hour | 8 | 3.67 min |
| Sella Brunechdetachable | Chairlift | 991 m | 193 m | 2,143 / 2,336 m | 2,400 people/hour | 4 | 3.5 min |
| Sass de la Vegla | Chairlift | 982 m | 107 m | 2,155 / 2,262 m | 1,192 people/hour | 2 | 9 min |
| Coston | Chairlift | 979 m | 373 m | 1,604 / 1,977 m | - | 2 | - |
| Monte Pizbubbledetachable | Chairlift | 976 m | 159 m | 1,778 / 1,937 m | 2,000 people/hour | 4 | 3.7 min |
| Col de Valvacin | Chairlift | 969 m | 273 m | 2,071 / 2,344 m | 1,800 people/hour | 4 | 9.5 min |
| Sochers - Ciampinoibubbledetachable | Chairlift | 958 m | 255 m | 1,946 / 2,201 m | 2,000 people/hour | 6 | 3.5 min |
| Pradücbubbledetachable | Chairlift | 958 m | 2 m | 1,343 / 1,345 m | 1,200 people/hour | 4 | 3.5 min |
| Castellazzo | Chairlift | 955 m | 211 m | 1,982 / 2,193 m | - | 3 | - |
| Sotsaslongbubbleheated seatsdetachable | Chairlift | 954 m | 193 m | 2,011 / 2,204 m | 1,800 people/hour | 4 | 3.5 min |
| Alpe Potor - Nuvolao | Chairlift | 948 m | 270 m | 2,158 / 2,428 m | 1,200 people/hour | 2 | 6.5 min |
| Tramansopen in summerbike transport | Chairlift | 945 m | 212 m | 1,914 / 2,126 m | 1,200 people/hour | 2 | 6 min |
| Mesola | Chairlift | 944 m | 152 m | 2,107 / 2,259 m | 2,400 people/hour | 4 | 8.66 min |
| Sass Becèbubbledetachable | Chairlift | 941 m | 251 m | 2,147 / 2,398 m | 1,542 people/hour | 6 | 3.5 min |
| Cherz Ibike transport | Chairlift | 936 m | 236 m | 1,843 / 2,079 m | 2,000 people/hour | 4 | 6.33 min |
| Lagorai | Chairlift | 934 m | 212 m | 1,994 / 2,206 m | - | 4 | - |
| Aloch | Chairlift | 932 m | 304 m | 1,332 / 1,636 m | 1,800 people/hour | 3 | 9 min |
| Valgranda | Chairlift | 931 m | 261 m | 1,596 / 1,857 m | - | 2 | - |
| Alpenrose (Vauz - La Viza)bubble | Chairlift | 929 m | 57 m | 1,896 / 1,953 m | 2,600 people/hour | 6 | 3.33 min |
| Biokbubbledetachable | Chairlift | 928 m | 151 m | 1,903 / 2,054 m | 2,800 people/hour | 6 | 3.3 min |
| Plancios | Chairlift | 927 m | 326 m | 1,742 / 2,068 m | - | 2 | - |
| Campolongo - Bec de Rocesdetachableopen in summerbike transport | Chairlift | 925 m | 249 m | 1,845 / 2,094 m | 2,190 people/hour | 4 | 3.5 min |
| Vitelli | Chairlift | 910 m | 290 m | 2,034 / 2,324 m | - | 4 | - |
| Mezdìheated seats | Chairlift | 907 m | 197 m | 1,831 / 2,028 m | 2,700 people/hour | 6 | 3.3 min |
| Le Paledetachable | Chairlift | 902 m | 285 m | 1,820 / 2,105 m | 2,400 people/hour | 4 | 4.17 min |
| Arabba - Monte Burzdetachableopen in summerbike transport | Chairlift | 895 m | 312 m | 1,618 / 1,930 m | 2,200 people/hour | 4 | 3.5 min |
| Roseal - Giumela | Chairlift | 874 m | 240 m | 2,184 / 2,424 m | 2,200 people/hour | 4 | 3.16 min |
| Comici Ibubbledetachable | Chairlift | 869 m | 135 m | 2,011 / 2,146 m | 1,800 people/hour | 6 | 3.17 min |
| Delle Costebike transport | Chairlift | 856 m | 219 m | 1,406 / 1,625 m | 2,000 people/hour | 4 | - |
| Cherz II | Chairlift | 853 m | 232 m | 1,847 / 2,079 m | 1,194 people/hour | 2 | 6.5 min |
| Scandola | Chairlift | 850 m | 182 m | 1,882 / 2,064 m | - | 3 | - |
| Pian Peccei - Pramartinbubbledetachable | Chairlift | 844 m | 290 m | 1,802 / 2,092 m | 2,000 people/hour | 4 | 3 min |
| Paradiso | Chairlift | 817 m | 309 m | 1,875 / 2,184 m | - | 4 | - |
| Seggiovia Fertazzabike transport | Chairlift | 815 m | 233 m | 1,844 / 2,077 m | 2,400 people/hour | 4 | - |
| Santa Cristina - Monte Panabike transport | Chairlift | 801 m | 225 m | 1,393 / 1,618 m | 900 people/hour | 2 | - |
| Sodlisiabubbleheated seatsdetachable | Chairlift | 799 m | 92 m | 1,590 / 1,682 m | 3,600 people/hour | 8 | 2.83 min |
| Tambres | Chairlift | 787 m | 222 m | 1,105 / 1,327 m | - | - | - |
| Padeon | Chairlift | 769 m | 206 m | 2,016 / 2,222 m | - | 4 | - |
| Monte Cuzzo | Chairlift | 762 m | 275 m | 2,200 / 2,475 m | - | 4 | - |
| La Residenza - Passo Feudo | Chairlift | 755 m | 289 m | 1,875 / 2,164 m | 2,400 people/hour | 4 | - |
| Prè dai Corf | Chairlift | 751 m | 131 m | 1,920 / 2,051 m | 1,200 people/hour | 2 | 5.5 min |
| Antercrëp | Chairlift | 749 m | 279 m | 2,111 / 2,390 m | 1,800 people/hour | 6 | 2.3 min |
| Bambydetachablebike transport | Chairlift | 731 m | 281 m | 1,790 / 2,071 m | 2,200 people/hour | 6 | 2.8 min |
| La Frainabike transport | Chairlift | 731 m | 183 m | 1,791 / 1,974 m | 2,400 people/hour | 6 | 2.8 min |
| Steinermandlbubbleheated seats | Chairlift | 715 m | 279 m | 1,824 / 2,103 m | - | 6 | - |
| Val | Chairlift | 712 m | 195 m | 1,614 / 1,809 m | 1,200 people/hour | 2 | 5.17 min |
| Saletei (Maria) | Chairlift | 708 m | 133 m | 2,112 / 2,245 m | 1,800 people/hour | 3 | 5.16 min |
| Cima Uomo | Chairlift | 700 m | 212 m | 2,258 / 2,470 m | 1,790 people/hour | 4 | 5.3 min |
| Costorattabubble | Chairlift | 695 m | 215 m | 1,851 / 2,066 m | 3,400 people/hour | 8 | 2.35 min |
| Rifugio Cai | Chairlift | 692 m | 255 m | 2,196 / 2,451 m | - | 3 | - |
| Salei | Chairlift | 692 m | 256 m | 2,126 / 2,382 m | 1,800 people/hour | 4 | - |
| Sonnebubble | Chairlift | 680 m | 196 m | 2,076 / 2,272 m | 2,200 people/hour | 6 | 2.5 min |
| Eurodetachable | Chairlift | 680 m | 108 m | 1,806 / 1,914 m | 2,400 people/hour | 4 | 3 min |
| Cirdetachablebike transport | Chairlift | 671 m | 177 m | 2,144 / 2,321 m | 2,400 people/hour | 4 | 3.17 min |
| Pala del Gheiger | Chairlift | 660 m | 184 m | 2,118 / 2,302 m | 1,800 people/hour | 4 | 6.33 min |
| Duca d'Aosta - Forcella Pomedesbike transport | Chairlift | 654 m | 208 m | 2,097 / 2,305 m | 1,800 people/hour | 3 | 4.8 min |
| Ferrari | Chairlift | 647 m | 128 m | 1,881 / 2,009 m | - | 2 | - |
| Rio Gere - Pian de Ra Bigontina | Chairlift | 641 m | 61 m | 1,691 / 1,752 m | - | 2 | - |
| Catores | Chairlift | 634 m | 176 m | 2,301 / 2,477 m | 1,028 people/hour | 2 | 4.7 min |
| Rododendro | Chairlift | 634 m | 197 m | 1,915 / 2,112 m | - | 4 | - |
| Pelmo | Chairlift | 633 m | 117 m | 1,792 / 1,909 m | - | 4 | - |
| Stella Alpina | Chairlift | 625 m | 150 m | 1,843 / 1,993 m | 2,475 people/hour | 6 | 2.83 min |
| Sochersdetachable | Chairlift | 617 m | 167 m | 1,934 / 2,101 m | 2,175 people/hour | 4 | 2.17 min |
| La Brancia | Chairlift | 614 m | 129 m | 1,899 / 2,028 m | 2,800 people/hour | 6 | 2.1 min |
| Belvedere | Chairlift | 611 m | 109 m | 2,147 / 2,256 m | 1,028 people/hour | 4 | 4.67 min |
| Ciampaidetachable | Chairlift | 609 m | 94 m | 1,913 / 2,007 m | 2,002 people/hour | 6 | 2.17 min |
| Cacciatori | Chairlift | 601 m | 136 m | 2,452 / 2,588 m | 1,200 people/hour | 2 | 4.3 min |
| Costa | Chairlift | 596 m | 105 m | 1,738 / 1,843 m | 2,400 people/hour | 4 | 2.7 min |
| Reiterjochbubbleheated seats | Chairlift | 595 m | 151 m | 1,858 / 2,009 m | 2,400 people/hour | 8 | 2 min |
| Raut | Chairlift | 588 m | 123 m | 1,136 / 1,259 m | - | 2 | - |
| Corno Bianco | Chairlift | 582 m | 178 m | 1,987 / 2,165 m | 1,200 people/hour | 2 | - |
| Sanon | Chairlift | 578 m | 82 m | 1,842 / 1,924 m | 1,200 people/hour | 2 | 5.7 min |
| Leo Demetz | Chairlift | 577 m | 102 m | 1,913 / 2,015 m | 1,200 people/hour | 2 | 5.2 min |
| Cristelin | Chairlift | 577 m | 145 m | 1,601 / 1,746 m | - | 2 | - |
| Costes da l'Ega | Chairlift | 560 m | 53 m | 1,545 / 1,598 m | 2,400 people/hour | 4 | 4.17 min |
| Soledetachable | Chairlift | 557 m | 87 m | 1,972 / 2,059 m | 2,400 people/hour | 4 | 2 min |
| Coston | Chairlift | 556 m | 56 m | 1,921 / 1,977 m | - | 2 | - |
| Roby | Chairlift | 554 m | 98 m | 1,928 / 2,026 m | 2,800 people/hour | 6 | 2 min |
| Piza Pranseiesopen in summer | Chairlift | 543 m | 130 m | 2,040 / 2,170 m | 1,200 people/hour | 2 | 4.33 min |
| Buffaure | Chairlift | 530 m | 184 m | 1,920 / 2,104 m | 1,800 people/hour | 4 | 5.16 min |
| Rodella des Alpesbike transport | Chairlift | 528 m | 147 m | 2,224 / 2,371 m | 1,800 people/hour | 4 | - |
| Obereggen | Chairlift | 525 m | 89 m | 1,938 / 2,027 m | 2,400 people/hour | 4 | - |
| Campigol | Chairlift | 519 m | 90 m | 1,900 / 1,990 m | 1,600 people/hour | 4 | 5 min |
| Cavazes - Grohmann | Chairlift | 518 m | 94 m | 2,230 / 2,324 m | 2,145 people/hour | 4 | 4 min |
| Übungslift | Chairlift | 517 m | 104 m | 1,925 / 2,029 m | - | 4 | - |
| Campanil | Chairlift | 495 m | 107 m | 1,942 / 2,049 m | 1,800 people/hour | 6 | - |
| Cimon | Chairlift | 473 m | 61 m | 1,948 / 2,009 m | - | 4 | - |
| Falzarego | Chairlift | 456 m | 104 m | 2,053 / 2,157 m | 1,800 people/hour | 3 | 3.5 min |
| Pian Peccei - Ciampedie | Chairlift | 448 m | 177 m | 1,804 / 1,981 m | - | 4 | 1.66 min |
| Arabba Fly | Chairlift | 447 m | 37 m | 1,634 / 1,671 m | 6,000 people/hour | 6 | 1.5 min |
| Al Sole | Chairlift | 432 m | 138 m | 1,866 / 2,004 m | 1,200 people/hour | 2 | 4 min |
| Cima Tognola | Chairlift | 428 m | 119 m | 2,212 / 2,331 m | - | 4 | - |
| Costabelladetachableopen in summer | Chairlift | 411 m | 164 m | 1,572 / 1,736 m | 2,000 people/hour | 4 | 2.17 min |
| Croda Negra | Chairlift | 394 m | 158 m | 2,246 / 2,404 m | 1,200 people/hour | 2 | 3.2 min |
| Del Passo | Chairlift | 392 m | 61 m | 1,878 / 1,939 m | 2,000 people/hour | 4 | - |
| Val Setus | Chairlift | 382 m | 124 m | 2,155 / 2,279 m | 2,200 people/hour | 4 | 3.33 min |
| Cisles | Chairlift | 380 m | 164 m | 1,938 / 2,102 m | 1,200 people/hour | 2 | 3.8 min |
| Camp Scuola Ciampediè | Chairlift | 380 m | 41 m | 1,953 / 1,994 m | 1,200 people/hour | 4 | 3.33 min |
| Bambybubbleheated seats | Chairlift | 379 m | 56 m | 1,913 / 1,969 m | 2,800 people/hour | 6 | 1.5 min |
| Prè Ciablun | Chairlift | 373 m | 21 m | 1,997 / 2,018 m | 1,780 people/hour | 4 | 3.33 min |
| Campo Scuola Latemar | Chairlift | 367 m | 33 m | 1,972 / 2,005 m | 1,800 people/hour | 4 | - |
| Campo Scuola Gardonè | Chairlift | 354 m | 84 m | 1,691 / 1,775 m | 1,800 people/hour | 4 | - |
| Comici IIbubbledetachable | Chairlift | 334 m | 59 m | 2,143 / 2,202 m | - | 4 | 1.17 min |
| Baby Socrepes | Chairlift | 325 m | 33 m | 1,351 / 1,384 m | 1,096 people/hour | 2 | 3 min |
| Lago Cavia - Laresei | Chairlift | 288 m | 82 m | 2,114 / 2,196 m | 1,490 people/hour | 4 | 3 min |
| Doninz | Chairlift | 236 m | 49 m | 1,431 / 1,480 m | 1,460 people/hour | 4 | 2.2 min |
| La Rüa | Chairlift | 203 m | 8 m | 1,419 / 1,427 m | 2,400 people/hour | 4 | 1.8 min |
| Colz | Chairlift | 202 m | 18 m | 1,436 / 1,454 m | 1,720 people/hour | 4 | 1.8 min |
| Baby | Chairlift | 160 m | 49 m | 1,476 / 1,525 m | - | 4 | - |
| Fungeia | Chairlift | 135 m | 33 m | 1,592 / 1,625 m | 1,800 people/hour | 3 | 1.1 min |
| Riepen | Drag lift | 1,504 m | 383 m | 1,255 / 1,638 m | - | - | - |
| Palma | Drag lift | 1,485 m | 300 m | 1,328 / 1,628 m | - | 1 | - |
| Berglift | Drag lift | 1,226 m | 296 m | 1,476 / 1,772 m | - | - | - |
| Incisa | Drag lift | 1,207 m | 185 m | 1,934 / 2,119 m | 720 people/hour | - | 9 min |
| Sonnleiten | Drag lift | 1,170 m | 216 m | 1,418 / 1,634 m | - | - | - |
| Tasa | Drag lift | 1,165 m | 141 m | 1,309 / 1,450 m | - | - | - |
| Crep de Mont | Drag lift | 1,142 m | 249 m | 1,704 / 1,953 m | 364 people/hour | - | 10 min |
| Filler | Drag lift | 1,049 m | 268 m | 1,238 / 1,506 m | 900 people/hour | - | 10 min |
| Capanna Nera | Drag lift | 905 m | 121 m | 1,598 / 1,719 m | 900 people/hour | - | 4 min |
| Plateau | Drag lift | 894 m | 194 m | 2,229 / 2,423 m | - | - | - |
| Campo Scuola | Drag lift | 884 m | 123 m | 1,681 / 1,804 m | 900 people/hour | - | - |
| Pralongià I | Drag lift | 827 m | 133 m | 1,726 / 1,859 m | 720 people/hour | - | 6.17 min |
| Skilift Lastie | Drag lift | 815 m | 193 m | 1,655 / 1,848 m | 720 people/hour | 1 | - |
| Doris | Drag lift | 781 m | 182 m | 1,308 / 1,490 m | - | - | - |
| Chiesetta 1 | Drag lift | 736 m | 106 m | 1,914 / 2,020 m | 830 people/hour | 1 | 7 min |
| Chiesetta 2 | Drag lift | 736 m | 106 m | 1,914 / 2,020 m | 830 people/hour | 1 | 7 min |
| Moncucco | Drag lift | 726 m | 172 m | 1,232 / 1,404 m | - | - | - |
| Panorama | Drag lift | 725 m | 179 m | 1,247 / 1,426 m | - | - | - |
| Rungg | Drag lift | 723 m | 117 m | 1,064 / 1,181 m | 720 people/hour | - | - |
| Rienza | Drag lift | 709 m | 113 m | 1,208 / 1,321 m | - | 1 | - |
| Pudra | Drag lift | 708 m | 120 m | 1,801 / 1,921 m | - | - | 5.17 min |
| Col Gallina | Drag lift | 688 m | 137 m | 2,153 / 2,290 m | 900 people/hour | - | 4.5 min |
| Rolle | Drag lift | 686 m | 89 m | 1,905 / 1,994 m | - | - | - |
| Belamont | Drag lift | 686 m | 177 m | 1,731 / 1,908 m | - | 1 | - |
| Golf I | Drag lift | 680 m | 93 m | 1,644 / 1,737 m | - | - | - |
| Palafavera | Drag lift | 657 m | 182 m | 1,517 / 1,699 m | - | 1 | - |
| La Loita | Drag lift | 644 m | 112 m | 1,757 / 1,869 m | - | - | - |
| Panorama | Drag lift | 642 m | 108 m | 1,359 / 1,467 m | - | - | - |
| Donarié | Drag lift | 634 m | 87 m | 1,033 / 1,120 m | - | - | - |
| Corno Nero 2 | Drag lift | 628 m | 105 m | 1,997 / 2,102 m | 800 people/hour | - | 4.4 min |
| Parallel | Drag lift | 625 m | 61 m | 1,635 / 1,696 m | - | - | - |
| Corno Nero 1 | Drag lift | 623 m | 105 m | 1,997 / 2,102 m | 900 people/hour | - | 3.5 min |
| Trenker | Drag lift | 621 m | 161 m | 1,221 / 1,382 m | - | - | - |
| Strega | Drag lift | 604 m | 77 m | 2,043 / 2,120 m | - | - | 5.5 min |
| Nova Ponente | Drag lift | 604 m | 129 m | 1,399 / 1,528 m | - | - | - |
| Tondi di Faloria | Drag lift | 600 m | 133 m | 2,114 / 2,247 m | - | - | - |
| Armentarola | Drag lift | 584 m | 63 m | 1,621 / 1,684 m | 897 people/hour | - | 4.2 min |
| Untertal | Drag lift | 584 m | 144 m | 1,469 / 1,613 m | - | - | - |
| Antermoia | Drag lift | 565 m | 179 m | 1,525 / 1,704 m | - | - | - |
| Malga Varena | Drag lift | 562 m | 65 m | 1,768 / 1,833 m | - | - | - |
| Sasso di Rocca | Drag lift | 559 m | 107 m | 2,187 / 2,294 m | 800 people/hour | - | 4.5 min |
| Casot di Pecol | Drag lift | 554 m | 155 m | 1,581 / 1,736 m | - | 1 | - |
| Skilift Rio Canedo | Drag lift | 546 m | 124 m | 1,724 / 1,848 m | 883 people/hour | 1 | - |
| Senoner | Drag lift | 539 m | 85 m | 1,782 / 1,867 m | 795 people/hour | - | - |
| Kameriot | Drag lift | 537 m | 84 m | 1,436 / 1,520 m | 900 people/hour | - | 4.5 min |
| Unnamed lift | Drag lift | 524 m | 139 m | 1,298 / 1,437 m | - | - | - |
| Le Pope | Drag lift | 502 m | 59 m | 1,757 / 1,816 m | 720 people/hour | - | - |
| Furdenan | Drag lift | 496 m | 101 m | 1,223 / 1,324 m | - | - | 3.2 min |
| Dorflift Kastelruth | Drag lift | 489 m | 68 m | 1,087 / 1,155 m | - | - | - |
| Eben | Drag lift | 476 m | 96 m | 1,555 / 1,651 m | - | - | - |
| Risaccia II | Drag lift | 471 m | 116 m | 1,629 / 1,745 m | 898 people/hour | - | - |
| Risaccia I | Drag lift | 470 m | 116 m | 1,629 / 1,745 m | 898 people/hour | - | 4.5 min |
| Brunner | Drag lift | 464 m | 92 m | 1,416 / 1,508 m | - | 800 | 3 min |
| Pobist | Drag lift | 463 m | 58 m | 1,370 / 1,428 m | - | - | - |
| Delle Baite | Drag lift | 459 m | 98 m | 2,145 / 2,243 m | 720 people/hour | - | - |
| Unnamed lift | Drag lift | 452 m | 57 m | 1,341 / 1,398 m | - | - | - |
| Waldheim II | Drag lift | 448 m | 83 m | 1,314 / 1,397 m | - | - | - |
| Waldheim I | Drag lift | 447 m | 83 m | 1,314 / 1,397 m | - | - | - |
| Pezzei | Drag lift | 445 m | 64 m | 1,613 / 1,677 m | - | - | - |
| Gonzaga | Drag lift | 433 m | 79 m | 2,111 / 2,190 m | 591 people/hour | - | - |
| Codes | Drag lift | 430 m | 58 m | 1,933 / 1,991 m | 900 people/hour | - | 2.2 min |
| Gallo Cedrone | Drag lift | 415 m | 66 m | 2,112 / 2,178 m | - | - | - |
| Lärchen | Drag lift | 412 m | 88 m | 1,402 / 1,490 m | - | - | - |
| Skilift Pichl | Drag lift | 406 m | 127 m | 1,228 / 1,355 m | - | - | - |
| Capanna Margherita | Drag lift | 405 m | 65 m | 1,901 / 1,966 m | 900 people/hour | - | 4 min |
| Passo Cereda | Drag lift | 404 m | 100 m | 1,387 / 1,487 m | - | - | - |
| Unnamed lift | Drag lift | 402 m | 109 m | 1,302 / 1,411 m | - | - | - |
| Panorama | Drag lift | 400 m | 106 m | 2,115 / 2,221 m | 902 people/hour | - | - |
| La Para | Drag lift | 395 m | 87 m | 1,942 / 2,029 m | 900 people/hour | - | - |
| Maders | Drag lift | 380 m | 148 m | 1,062 / 1,210 m | - | - | - |
| Puntea | Drag lift | 377 m | 51 m | 1,638 / 1,689 m | - | - | - |
| Eurotel | Drag lift | 369 m | 62 m | 1,814 / 1,876 m | 500 people/hour | - | 3.3 min |
| Le Buse Scuola | Drag lift | 342 m | 64 m | 1,872 / 1,936 m | 900 people/hour | 1 | 3 min |
| Croda Rossa | Drag lift | 327 m | 119 m | 1,894 / 2,013 m | - | - | - |
| Cendevaves | Drag lift | 326 m | 43 m | 1,640 / 1,683 m | 900 people/hour | - | - |
| Cadepunt | Drag lift | 318 m | 18 m | 1,604 / 1,622 m | - | - | - |
| Tschucky | Drag lift | 316 m | 24 m | 1,627 / 1,651 m | 700 people/hour | - | - |
| Biancaneve | Drag lift | 300 m | 42 m | 1,589 / 1,631 m | 600 people/hour | - | - |
| Larciunei | Drag lift | 298 m | 42 m | 1,589 / 1,631 m | 600 people/hour | - | - |
| Mariaz | Drag lift | 297 m | 30 m | 1,446 / 1,476 m | - | 1 | - |
| Bruggerleite | Drag lift | 288 m | 116 m | 1,349 / 1,465 m | - | - | - |
| Baby La Crusc | Drag lift | 279 m | 32 m | 1,343 / 1,375 m | 720 people/hour | - | 2.5 min |
| Col de Lin | Drag lift | 278 m | 94 m | 1,419 / 1,513 m | - | - | - |
| Santa Fosca | Drag lift | 278 m | 35 m | 1,369 / 1,404 m | - | - | - |
| Terza Punta | Drag lift | 274 m | 100 m | 1,577 / 1,677 m | 781 people/hour | - | - |
| Nives | Drag lift | 273 m | 18 m | 1,570 / 1,588 m | 900 people/hour | - | - |
| Campo Freina | Drag lift | 269 m | 105 m | 1,575 / 1,680 m | 720 people/hour | - | - |
| Abrusé | Drag lift | 246 m | 32 m | 1,530 / 1,562 m | 893 people/hour | - | - |
| Golf II | Drag lift | 240 m | 34 m | 1,644 / 1,678 m | - | - | - |
| Pera - Fraine | Drag lift | 240 m | 58 m | 1,317 / 1,375 m | - | - | - |
| Randötsch | Drag lift | 238 m | 47 m | 1,027 / 1,074 m | - | - | - |
| Prà Nasse | Drag lift | 232 m | 60 m | 1,493 / 1,553 m | - | - | - |
| Prà Nasse | Drag lift | 232 m | 60 m | 1,493 / 1,553 m | - | - | - |
| Palmer | Drag lift | 230 m | 38 m | 1,221 / 1,259 m | - | - | 1.7 min |
| Baby | Drag lift | 227 m | 29 m | 2,136 / 2,165 m | - | - | - |
| Ludy | Drag lift | 215 m | 27 m | 1,836 / 1,863 m | - | - | 2.3 min |
| Plan da Tieja | Drag lift | 202 m | 23 m | 1,468 / 1,491 m | 705 people/hour | - | 1.3 min |
| Gabia | Drag lift | 185 m | 33 m | 2,299 / 2,332 m | 550 people/hour | - | - |
| Campo Scuola Palma | Drag lift | 183 m | 37 m | 1,328 / 1,365 m | - | - | - |
| Campo Scuola Cermis | Drag lift | 173 m | 22 m | 1,973 / 1,995 m | - | - | - |
| Col d'Altin | Drag lift | 170 m | 17 m | 1,406 / 1,423 m | 600 people/hour | - | - |
| Erschbaum | Drag lift | 170 m | 14 m | 1,178 / 1,192 m | - | - | - |
| Avisio | Drag lift | 162 m | 44 m | 1,439 / 1,483 m | - | - | - |
| Pelmetto | Drag lift | 149 m | 37 m | 1,518 / 1,555 m | - | 1 | - |
| Campetto | Drag lift | 124 m | 27 m | 1,736 / 1,763 m | - | 1 | - |
| Campo Scuola Valbona | Drag lift | 123 m | 24 m | 1,816 / 1,840 m | 720 people/hour | - | - |
| Unnamed lift | Rope tow | 823 m | 211 m | 1,646 / 1,857 m | - | - | - |
| Manovia Restaurant | Rope tow | 174 m | 5 m | 1,988 / 1,993 m | - | - | - |
| Ski Pfalzen | Rope tow | 149 m | 33 m | 993 / 1,026 m | - | - | - |
| Mickey Mouse | Rope tow | 89 m | 6 m | 1,583 / 1,589 m | 700 people/hour | - | - |
| Unnamed lift | Rope tow | 47 m | 13 m | 1,137 / 1,150 m | - | - | - |
| Unnamed lift | Magic carpet | 191 m | 12 m | 1,985 / 1,997 m | - | - | - |
| Unnamed lift | Magic carpet | 177 m | 43 m | 1,286 / 1,329 m | - | - | - |
| Nani Lift | Magic carpet | 147 m | 26 m | 1,755 / 1,781 m | - | - | - |
| Unnamed lift | Magic carpet | 121 m | 5 m | 2,052 / 2,057 m | - | - | - |
| Doss dei Laresi | Magic carpet | 118 m | 33 m | 1,283 / 1,316 m | - | - | - |
| Unnamed lift | Magic carpet | 113 m | 13 m | 956 / 969 m | - | - | - |
| Unnamed lift | Magic carpet | 98 m | 4 m | 1,451 / 1,455 m | - | - | - |
| Unnamed lift | Magic carpet | 97 m | 20 m | 1,387 / 1,407 m | - | - | - |
| Unnamed lift | Magic carpet | 91 m | 15 m | 1,810 / 1,825 m | - | - | - |
| Magic carpet 29 | Magic carpet | 79 m | 13 m | 1,671 / 1,684 m | - | - | - |
| Magic carpet 29 | Magic carpet | 79 m | 13 m | 1,671 / 1,684 m | - | - | - |
| Kinderteppich | Magic carpet | 79 m | 4 m | 1,594 / 1,598 m | - | - | - |
| Tappeto scuola sci | Magic carpet | 77 m | 5 m | 1,627 / 1,632 m | - | - | - |
| Unnamed lift | Magic carpet | 76 m | 2 m | 1,820 / 1,822 m | - | - | - |
| Unnamed lift | Magic carpet | 70 m | 9 m | 1,915 / 1,924 m | - | - | - |
| Unnamed lift | Magic carpet | 69 m | 8 m | 1,991 / 1,999 m | - | - | - |
| Unnamed lift | Magic carpet | 66 m | 7 m | 1,719 / 1,726 m | - | - | - |
| Unnamed lift | Magic carpet | 62 m | 2 m | 1,417 / 1,419 m | - | - | - |
| Unnamed lift | Magic carpet | 60 m | 7 m | 1,530 / 1,537 m | - | - | - |
| Unnamed lift | Magic carpet | 59 m | 3 m | 1,325 / 1,328 m | - | - | - |
| Unnamed lift | Magic carpet | 58 m | 9 m | 1,684 / 1,693 m | - | - | - |
| Unnamed lift | Magic carpet | 56 m | 7 m | 1,680 / 1,687 m | - | - | - |
| Unnamed lift | Magic carpet | 55 m | 14 m | 1,618 / 1,632 m | - | - | - |
| Unnamed lift | Magic carpet | 54 m | 4 m | 1,888 / 1,892 m | - | - | - |
| Unnamed lift | Magic carpet | 53 m | 1 m | 1,990 / 1,991 m | - | - | - |
| Unnamed lift | Magic carpet | 53 m | 7 m | 1,333 / 1,340 m | - | - | - |
| Unnamed lift | Magic carpet | 53 m | 6 m | 1,321 / 1,327 m | - | - | - |
| Magic carpet 75 | Magic carpet | 50 m | 14 m | 1,754 / 1,768 m | - | - | - |
| Unnamed lift | Magic carpet | 50 m | 7 m | 1,314 / 1,321 m | - | - | - |
| Unnamed lift | Magic carpet | 49 m | 8 m | 1,941 / 1,949 m | - | - | - |
| Unnamed lift | Magic carpet | 48 m | 0 m | 1,711 / 1,711 m | - | - | - |
| Unnamed lift | Magic carpet | 48 m | 14 m | 1,618 / 1,632 m | - | - | - |
| Unnamed lift | Magic carpet | 46 m | 14 m | 1,534 / 1,548 m | - | - | - |
| Unnamed lift | Magic carpet | 46 m | 44 m | 1,457 / 1,501 m | - | - | - |
| Unnamed lift | Magic carpet | 44 m | 8 m | 1,539 / 1,547 m | - | - | - |
| Unnamed lift | Magic carpet | 42 m | 17 m | 1,439 / 1,456 m | - | - | - |
| Unnamed lift | Magic carpet | 41 m | 0 m | 791 / 791 m | - | - | - |
| Unnamed lift | Magic carpet | 36 m | 0 m | 1,417 / 1,417 m | - | - | - |
| Unnamed lift | Magic carpet | 34 m | 2 m | 789 / 791 m | - | - | - |
| Unnamed lift | Magic carpet | 33 m | 6 m | 2,192 / 2,198 m | - | - | - |
| Unnamed lift | Magic carpet | 32 m | 0 m | 1,753 / 1,753 m | - | - | - |
| Unnamed lift | Magic carpet | 32 m | 2 m | 1,477 / 1,479 m | - | - | - |
| Unnamed lift | Magic carpet | 32 m | 0 m | 1,439 / 1,439 m | - | - | - |
| Unnamed lift | Magic carpet | 29 m | 0 m | 1,629 / 1,629 m | - | - | - |
| Unnamed lift | Magic carpet | 28 m | 4 m | 1,758 / 1,762 m | - | - | - |
| Unnamed lift | Magic carpet | 28 m | 6 m | 1,588 / 1,594 m | - | - | - |
| Unnamed lift | Magic carpet | 27 m | 0 m | 1,803 / 1,803 m | - | - | - |
| Unnamed lift | Magic carpet | 27 m | 0 m | 1,736 / 1,736 m | - | - | - |
| Unnamed lift | Magic carpet | 26 m | 6 m | 1,892 / 1,898 m | - | - | - |
| Unnamed lift | Magic carpet | 25 m | 6 m | 1,631 / 1,637 m | - | - | - |
| Unnamed lift | Magic carpet | 20 m | 0 m | 1,611 / 1,611 m | - | - | - |
| Unnamed lift | Magic carpet | 20 m | 0 m | 1,413 / 1,413 m | - | - | - |
Lift data: OpenStreetMap (ODbL); elevations: Open-Meteo. Updated 22 August 2026. Report an error or a missing lift
Lift map
Routes from OpenStreetMap lifts. Colour by lift type.
- Cable car
- Gondola
- Hybrid lift
- Chairlift
- Drag lift
- Rope tow
- Magic carpet
Weather at the base and on top
Live webcams
Frequently asked questions
How many lifts are there in Dolomiti Superski?
Dolomiti Superski has 468 active lifts mapped on OpenStreetMap: 18 cable cars, 100 gondolas, 2 hybrid lifts, 185 chairlifts, 106 drag lifts, 5 rope tows and 52 magic carpets. The full list with length, altitudes and capacity is in the table on this page.
Which is the highest lift in Dolomiti Superski?
Serauta - Punta Rocca, with its top station at about 3,215 m.
How much is a day pass in Dolomiti Superski?
The adult day pass starts from about 76 euro in high season. Full rates, discounts and online purchase are on the ski pass page.
When do the lifts open in Dolomiti Superski?
The winter season usually runs from late November or early December until Easter; many cable cars and gondolas reopen in summer from June to September for hikers and bikers. Dates and live lift status are on the official site and in our opening guides.